NEW QUESTION 19
After the presentation, you are asked to explain the chart.
Assume you have applied a full risk-based testing strategy.

Which of the following answers would you expect to best describe the pie chart?
K4 3 credits

  • A. Only the lowest-risk items, tests and bugs should remain in the blue and red areas. Therefore the application can be released at any time subject to management of the items identified in those areas
  • B. 97 percent of the risk items has been tested. No open bugs or test failures remain. Only 3 percent of risk items remains to be covered by the remaining test
  • C. All the risk items have been covered with tests. No more risk items remain to test
  • D. According to the full risk-based testing strategy applied, it is very likely that the highest-risk items, tests and bugs remain in the blue and red areas. Therefore, it is very risky to release the application

Answer: A

 

NEW QUESTION 20
Test Management
You are the Test Manager on a project following an iterative life-cycle model. The project should consist of nine iterations of one month duration each. It is planned to develop the most important features to have a stable core of the application in the first three iterations and to add the additional features in the last six iterations.
At the beginning of the first iteration, only a draft version of the requirements specification document for the core features is available. Assume that during each of the first three iterations, the chosen features are fully completed and unit tested.
Which of the following statements is true in this context?

  • A. You should allocate all the effort for the system test phase only in the last iteration
  • B. The system test phase should start when all the requirements are frozen
  • C. You should allocate a large effort for system testing during the first three iterations
  • D. You should apply the same test strategy as used in a sequential life cycle model

Answer: C

Explanation:
Section: Test Management

 

NEW QUESTION 21
Test Management
You are the Test Manager of a new project that will have three formal levels of testing: unit, integration and system testing. The testing strategy you decide to adopt a blend of risk-based testing and reactive testing strategies.
Which of the following answers describes the most consistent example of implementation of this test strategy during the execution of the system tests?
Number of correct responses: 1
K2 1 credit

  • A. Your test team executes scripted tests designed and implemented before the execution of the system test phase, to cover the identified product risks. It also performs exploratory testing sessions throughout the system test phase
  • B. Your test team executes system tests under the guidance of a sample of users throughout the system test phase
  • C. Your test team executes exploratory tests following a session-based test management approach throughout the system test phase
  • D. Your test team autonomously performs some exploratory testing sessions and, at the very end of the system testing phase, it also executes more system tests under the guidance of a sample of users

Answer: A

 

NEW QUESTION 22
Consider the following test strategies:
I. Consultative test strategy
II. Reactive test strategy
III. Analytical test strategy
IV. Process-compliant test strategy
Consider also the following examples of test activities:
1.Prioritize the test cases, based on the results of a FMEA analysis, to ensure early coverage of the most important areas and discovery of the most important defects during test execution
2.Execute usability testing driven by the guidance of a sample of users (external to the test team)
3.Perform exploratory testing sessions throughout the system test phase
4.On an Agile project, execute tests that cover the test conditions identified for each user story of a feature planned for an iteration
Which of the following correctly matches each test strategy with an appropriate example?
K2 1 credit

  • A. I-2; II-3; III-1; IV-4
  • B. I-1; II-2; III-3; IV-4
  • C. I-3; II-2; III-1; IV-4
  • D. I-2; II-3; III-4; IV-1

Answer: A

 

NEW QUESTION 23
Test Management
You are the Test Manager on a project following an iterative life-cycle model. The project should consist of nine iterations of one month duration each. It is planned to develop the most important features to have a stable core of the application in the first three iterations and to add the additional features in the last six iterations.
At the beginning of the first iteration, only a draft version of the requirements specification document for the core features is available. Assume that during each of the first three iterations, the chosen features are fully completed and unit tested.
Which of the following statements is true in this context?
Number of correct responses: 1
K4 3 credits

  • A. You should allocate all the effort for the system test phase only in the last iteration
  • B. The system test phase should start when all the requirements are frozen
  • C. You should allocate a large effort for system testing during the first three iterations
  • D. You should apply the same test strategy as used in a sequential life cycle model

Answer: C

 

NEW QUESTION 24
Test Management
Based on the historical data of 5 past and similar projects, you have calculated these average numbers of defects detected in system testing:
- for each 10000 LOC (lines of code), 200 defects
- for each person-month of development team effort, 49 defects
You want to use this information to perform estimation for a new project.
The project manager tells you that he/she has estimated 20000 new LOC for this new project.
Four developers work for four months on this project before system testing.
During system testing, 797 defects are discovered.
Assume that the system test of this new project is using the same amount of work as spent in the past projects.
Based on this information only, which of the following statement is certainly true about this project?
Number of correct responses: 1
K3 3 credits

  • A. 40000 LOC have been delivered to system testing (against the 20000 LOC planned by the project manager)
  • B. More LOC than planned have been delivered to system testing with a higher defect density than the past projects
  • C. The number of defects found during the system test phase on the new project is approximately proportional to the development team effort
  • D. The code for the new project contains a higher defect density than the code of the past projects

Answer: C

 

NEW QUESTION 25
Test Management
In the test strategy document your organization declares:
- to adopt a V-model development lifecycle, with three formal levels of testing: unit, integration and system testing
- to use a blended risk-based and regression-averse testing strategy for each level of testing The following is an excerpt of the "approach" section for the system test plan document of a new project:
"Testing will only use manual tests. Due to the short period of time for test execution, the following activities will be performed in parallel with test execution: Test planning, test analysis and test design.
Basic metrics will be taken for test effort (i.e. person-hours), test cases executed (passed/failed), and incidents (no more metrics, such as code coverage, will be collected)." In the system test plan, no deviations from the test strategy are described.
Based only on the given information, which of the following statements is true?

  • A. The approach described in the system test plan document is consistent with the test strategy
  • B. The approach described the system test plan document is inconsistent with both the risk-based and regression testing strategies
  • C. The approach described in the system test plan document is consistent with the risk-based testing strategy, but it is inconsistent with the regression testing strategy
  • D. The approach described in the system test plan document is consistent with the regression testing strategy, but it is inconsistent with the risk-based testing strategy

Answer: B

Explanation:
Section: Test Management

 

NEW QUESTION 26
Defect Management
During the system testing phase a tester from your test team observes a failure in the system under test and he/she decides to create an incident report. The incident report is currently in a "new" state, indicating it needs to be investigated.
Which THREE of the following information items can't yet be present in the incident report?

  • A. The lifecycle phase in which the defect has been introduced
  • B. The type of defect that caused the failure
  • C. The actual and the expected result highlighting the failure
  • D. Steps to reproduce the failure, including screenshots, database dumps and logs where applicable
  • E. What really caused the failure (actual cause)

Answer: A,B,E

 

NEW QUESTION 27
Assume that no additional product risks have been identified during the first week of test execution.


Which of the following answers would you expect to best describe the residual risks associated with the identified product risks, at the end of the first week of test execution?

  • A. Since R3 is the only risk for which all test cases have passed, the risk has been reduced by 20%
  • B. The test execution table doesn't give an indication of the risk level of the open defects and the test cases that failed or are not run yet
  • C. The residual risk level can't be determined, because it requires that all the test cases have been executed
  • D. The test execution status table indicates that the risk has been reduced by 56%

Answer: B

Explanation:
Section: Testing Process

 

NEW QUESTION 28
Reviews
You are the Test Manager of a project that adopts a V-model with four formal levels of testing: unit, integration, system and acceptance testing.
On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low-level design and code have been performed prior to testing.
Assume that no requirements defects have been reported after the release of the product.
Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness?
Number of correct responses: 2
K3 2 credits

  • A. Time to conduct the requirements review
  • B. Total number of defects found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing
  • C. Number of defects found during the requirements review
  • D. Total number of defects attributable to requirements, found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing
  • E. Total number of defects attributable to requirements found during unit, integration, system and acceptance testing

Answer: C,D

 

NEW QUESTION 29
Test Management
Which one of the following metrics to be produced needs traceability between the test cases and each item in a proper test basis?

  • A. Trends in the lag time from defect reporting to resolution
  • B. Mean time between failures for the system
  • C. Requirements coverage
  • D. Cumulative number of reported defects versus cumulative number of resolved defects

Answer: C

Explanation:
Section: Test Management
Explanation/Reference:

 

NEW QUESTION 30
During the system testing phase a tester from your test team observes a failure in the system under test and he/she decides to create an incident report. The incident report is currently in a "new" state, indicating it needs to be investigated.
Which THREE of the following information items can't yet be present in the incident report?
K3 2 credits (2 credits out of 3 credits correct, 1 credit point)

  • A. The lifecycle phase in which the defect has been introduced
  • B. The type of defect that caused the failure
  • C. The actual and the expected result highlighting the failure
  • D. Steps to reproduce the failure, including screenshots, database dumps and logs where applicable
  • E. What really caused the failure (actual cause)

Answer: A,B,E

 

NEW QUESTION 31
You can count on well-written requirements, but you can't count on an adequate contribution of the stakeholders to the quality risk analysis. You have to mitigate the insufficient contribution of the stakeholders because the risk-based testing approach shall minimize the product risks. Your test team has one expert tester in security testing.
Which of the following test activities would you expect to be the less important in this context?
K4 3 credits

  • A. Automate all functional and non-functional system tests
  • B. Extract from the defect tracking system of the previous project all the security defects and failures, and classify them to support design and execution of specific tests
  • C. Apply systematic and exploratory testing for integration and system test
  • D. Perform exploratory testing sessions with adequate charters covering security aspects

Answer: A

 

NEW QUESTION 32
Test Management
Based on the historical data of 5 past and similar projects, you have calculated these average numbers of defects detected in system testing:
- for each 10000 LOC (lines of code), 200 defects
- for each person-month of development team effort, 49 defects
You want to use this information to perform estimation for a new project.
The project manager tells you that he/she has estimated 20000 new LOC for this new project.
Four developers work for four months on this project before system testing.
During system testing, 797 defects are discovered.
Assume that the system test of this new project is using the same amount of work as spent in the past projects.
Based on this information only, which of the following statement is certainly true about this project?

  • A. 40000 LOC have been delivered to system testing (against the 20000 LOC planned by the project manager)
  • B. More LOC than planned have been delivered to system testing with a higher defect density than the past projects
  • C. The number of defects found during the system test phase on the new project is approximately proportional to the development team effort
  • D. The code for the new project contains a higher defect density than the code of the past projects

Answer: C

Explanation:
Section: Test Management

 

NEW QUESTION 33
Test Tools and Automation
Assume you are a Test Manager involved in system testing of a CRM application for a Pay-TV company.
Currently the application is able to support a proper number of users assuring the required responsiveness.
Since the business is expected to grow, you have been asked to evaluate the ability of the application to grow to support more users while maintaining the same responsiveness.
Which of the following tools would you expect to be the most useful at performing this evaluation?
Number of correct responses: 1
K2 1 credit

  • A. Coverage tools
  • B. Test management tools
  • C. Static analysis tools
  • D. Performance tools

Answer: D

 

NEW QUESTION 34
Test Tools and Automation
Assume you are a Test Manager involved in system testing of a CRM application for a Pay-TV company.
Currently the application is able to support a proper number of users assuring the required responsiveness. Since the business is expected to grow, you have been asked to evaluate the ability of the application to grow to support more users while maintaining the same responsiveness.
Which of the following tools would you expect to be the most useful at performing this evaluation?

  • A. Coverage tools
  • B. Test management tools
  • C. Static analysis tools
  • D. Performance tools

Answer: D

 

NEW QUESTION 35
Improving the Testing Process
Which of the following statements about the TMMi test process improvement model is true?
Number of correct responses: 1
K2 1 credit

  • A. In TMMi all the process areas at lower levels must be 75% complete by achieving specific and generic goals in order to claim the higher level
  • B. At TMMi level 1 testing is chaotic without a defined process, and it is often seen as the same as debugging
  • C. TMMi provides an approach for test process improvement such as the IDEAL (Initiating, Diagnosing, Establishing, Acting and Learning) model
  • D. TMMi has a staged architecture for process improvement with seven maturity levels

Answer: B

 

NEW QUESTION 36
You are the Test Manager for a project to develop a web customer portal of a Pay-TV company that allows customers (with a smartcard and a set-top box) to purchase digital contents.
In the "select" page the system displays a dialogue where the customer can select the items (digital contents) he/she is interested in. In this page he/she can add one or more items to a shopping cart. An item consists of a product and a duration.
There are three types of products: Movie, sport and premium (movie and sport).
There are four possible durations: 1 months, 2 months, winter (from the beginning of January to end of March) and summer (from the beginning of July to end of September).
All the combinations of products and durations are allowed to define an item. Thus there are twelve possible items. A maximum of six different items can be added to the shopping cart at a time.
When the customer decides to check out he/she goes to the "purchase" page where he/she can pay the total amount of the shopping cart in three different ways:
-
using a credit voucher
-
using a credit already charged on the smartcard
-
using a credit card (accepted credit cards are. Visa, MasterCard and Great Wall Card)
The customer can logout from both the "select" and "purchase" pages. In this case no purchase is made.
You decide to apply a blended risk-based and reactive testing strategy and the following is a subset of the exit criteria for system testing: EXCR1- Each "critical" quality risk item must be covered by at least one test condition EXCR2- Each "critical" requirement must be covered by at least one test condition
You are following a risk-based testing strategy. The test execution time is very limited. Assume that all the product risk items require more or less the same level of test effort.

Which of the following answers describes the best execution schedule in this scenario?
K3 3 credits

  • A. 1- Test the correct pre-activation of the Smart Card 2- Test the correct charge of the Smart Card with the required contents 3- Test the correct activation of the Smart Card 4- Test the acceptance of transactions coming from the IVR channel
  • B. 1- Test the acceptance of transactions coming from the IVR channel 2- Test the correct charge of the Smart Card with the required contents 3- Test the correct pre-activation of the Smart Card 4- Test the correct activation of the Smart Card
  • C. 1- Test the correct activation of the Smart Card 2- Test the correct pre-activation of the Smart Card 3- Test the correct charge of the Smart Card with the required contents 4- Test the acceptance of transactions coming from the IVR channel
  • D. 1- Test the correct pre-activation of the Smart Card 2- Test the correct activation of the Smart Card 3- Test the correct charge of the Smart Card with the required contents 4- Test the acceptance of transactions coming from the IVR channel

Answer: D

 

NEW QUESTION 37
Which of the following statements about the STEP test process improvement model is true?
K2 1 credit

  • A. The STEP model stresses defect detection and demonstration of capability, whereas the defect prevention is a secondary potential goal of testing
  • B. In the STEP model, testware design occurs after coding
  • C. The STEP model assures that the system requirements specification and the test design specification processes don't overlap
  • D. In the STEP model, tests validate the requirements and use cases when they are developed

Answer: D

 

NEW QUESTION 38
In the next two months some new features will be constantly added to new releases of a project you are working on as Test Manager.
You have identified as one of the main project risks, that the requirements specification will still be incomplete when your team starts the test design and implementation phase.
Some requirements will most likely be completed too late to allow a proper test preparation.
You and your test team have already worked on several similar past projects in the same organization.
Which one of the following options would you expect to be the most effective at mitigating this risk?
K4 3 credits

  • A. Even if there are only few details missing, escalate the risk to the project manager without preparing any tests
  • B. Make reasonable assumptions about the missing details and design lightweight tests that can be easily updated during test execution
  • C. Don't design any test until the test execution starts, then communicate that test execution is blocked due to incomplete requirements
  • D. Don't prepare any test and just run the regression test suite to check that the new features don't introduce regression

Answer: B

 

NEW QUESTION 39
Test Management
For which of the following activities would the costs be classified as a cost of detection?
Number of correct responses: 1
K2 1 credit

  • A. Re-running a test case, during the system testing phase, to verify that a fix eliminates a previously found defect
  • B. Training developers to better understand the new features of the coding language they will use on the project
  • C. Fixing field failures
  • D. Writing test specifications according to the test design

Answer: D

 

NEW QUESTION 40
......