NEW QUESTION # 13
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?

  • A. By providing future demands from demand figures in the past
  • B. By providing replenishment proposals with exact times
  • C. By providing cross-plant planning and deployment
  • D. By providing multilevel material requirements planning

Answer: B


NEW QUESTION # 14
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a transportation resource in the location master.
  • B. Model a handling resource in the location master and goods receipt time in the mater all master.
  • C. Model a resource inbound in the location master.
  • D. Model a separate resource inthe production data structure.

Answer: A,B


NEW QUESTION # 15
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.

  • A. Order type determination
  • B. Master data selection
  • C. Actual cost calculation
  • D. Planning selection
  • E. Capacity requirements determination

Answer: A,B,E


NEW QUESTION # 16
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The assigned routing must NOT have alternative sequences.
  • B. The lot size range must be within the lot-size range of the assigned routing.
  • C. The assigned routing must be a rate routing.
  • D. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • E. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.

Answer: B,D,E


NEW QUESTION # 17
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.

  • A. Multiple copies of the data exist
  • B. Only the OLAP system has the latest data
  • C. Only the OLAP system has a predefined subset of the data
  • D. The OLAP system needs to write back the data to the OLTP system
  • E. Batch process are required to keep OLTP and OLAP in sync

Answer: A,C,D,E


NEW QUESTION # 18
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Squeezing
  • B. Scheduling working time only
  • C. Find Slot
  • D. Insert operation

Answer: C


NEW QUESTION # 19
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent?

  • A. Number of individual capacities
  • B. Available capacity version
  • C. Capacity category
  • D. Work center category

Answer: C


NEW QUESTION # 20
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.

  • A. Individualconversion
  • B. Order release
  • C. Partial conversion
  • D. Full conversion

Answer: C,D


NEW QUESTION # 21
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Market intelligence
  • B. Past sales order quantities
  • C. One-off events
  • D. Past procurement quantities
  • E. Past quotation quantities

Answer: A,B,C


NEW QUESTION # 22
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question.

  • A. SAP S/4HANA on premise
  • B. SAP S/4HANA Professional services cloud
  • C. SAP S/4HANA private cloud
  • D. SAP S/4AHANA Enterprise Management cloud

Answer: A,C


NEW QUESTION # 23
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?

  • A. Delivery date
  • B. Costs
  • C. Vendor rating
  • D. Component availability
  • E. Quota arrangement

Answer: E


NEW QUESTION # 24
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Production orders are created with sales order reference.
  • B. Storage location MRP areas are required.
  • C. Sales order-specific stock is created
  • D. Sales order-specific planning run is required.
  • E. Net requirements calculation is sales order-specific.

Answer: A,C,E


NEW QUESTION # 25
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Work center
  • C. Material
  • D. Plant

Answer: B,C


NEW QUESTION # 26
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.

  • A. Production version data
  • B. Storage location data
  • C. Warehouse number data
  • D. MRP area data

Answer: B,C


NEW QUESTION # 27
Which material master setting is required to use the repetitive planning table for production with production orders?

  • A. The Selection Method must be set to "2 Selection by production version".
  • B. At least one valid production version must exist on the MRP4 view
  • C. An overall profile be assigned on the Work Scheduling view
  • D. A repetitive manufacturing profile must be assigned on the MRP4 view

Answer: D


NEW QUESTION # 28
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.

  • A. Using run schedule quantities for in-house production
  • B. Using quotations for internal and external procurement
  • C. Using stock transfer reservations for stock transfer
  • D. Using purchasing costs for automated source prioritization
  • E. Using purchase orders for external procurement

Answer: A,C,E


NEW QUESTION # 29
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Consumption sequence procedure
  • B. Requirements profile
  • C. Requirements type
  • D. Order type

Answer: C


NEW QUESTION # 30
What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question

  • A. Extract on, transformation, and loading (ETL)
  • B. Online analytical processing (OLAP)
  • C. Pre computed aggregation views
  • D. Online transaction processing (OLTP)

Answer: A,C


NEW QUESTION # 31
Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.

  • A. Goods receipt processing time
  • B. Planned delivery time
  • C. Planning time fence
  • D. Opening period

Answer: A,D


NEW QUESTION # 32
......

C-TS422-2020 Dumps - Pass Your Certification Exam: https://www.testkingfree.com/SAP/C-TS422-2020-practice-exam-dumps.html