NEW QUESTION 50
Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the customer need to be aware of?
Please choose the correct answer.
Response:
- A. Planned costs must not exceed the estimated costs.
- B. A specific order type in which cost estimates are activated must be used.
- C. Planned costs overwrite estimated costs after release of the order.
- D. Upon release of the order, estimated costs cannot be revised.
Answer: D
NEW QUESTION 51
Your customer wants to assign maintenance orders to network activities automatically with the
Maintenance Event Builder (MEB).
Which of the following steps must you perform?
There are 2 correct answers to this question.
Response:
- A. Assign the Reference PM/PS element to task list headers and network activities.
- B. Set the define Transfer of Project or Invest Program indicator.
- C. Assign maintenance orders manually to a revision with revision type WPS-controlled.
- D. Assign a network to a revision with revision type WPS-controlled.
- E. Assign a hierarchical task list to a notification.
Answer: A,D
NEW QUESTION 52
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?
- A. In the internal activity value category
- B. In a new, automatically created value category
- C. In the overhead value category
- D. In the unassigned value category
Answer: D
NEW QUESTION 53
Which utility is used to discover and configure an uninitialized SCv2000 array?
- A. DSM Collector
- B. DSM Client
- C. PuTTy
- D. Remote Client
Answer: B
NEW QUESTION 54
For which business requirements must you use serial numbers? (Choose two)
- A. To have a future option to track material items as pieces of equipment
- B. To uniquely identify inventory material items
- C. To have the option to track batches
- D. To have a future option to track material items as pieces of functional locations
Answer: A,B
NEW QUESTION 55
What are the prerequisites for installing equipment at a functional location? (Choose two)
- A. The functional location master record allows the installation.
- B. A fixed asset is assigned to the equipment.
- C. The equipment category of the equipment allows the installation.
- D. A cost center is assigned to the equipment.
Answer: A,C
NEW QUESTION 56
Which statements apply to a client in an SAP system?
Choose the correct answer(s).
Response:
- A. A client corresponds to a customer.
- B. In business terms, the client is a completely independent unit.
- C. Each client has their own database.
- D. A client can represent the mapping for an entire enterprise.
Answer: B,D
NEW QUESTION 57
Find out the elements responsible for performance management. (Choose three.)
- A. Execution
- B. Dispatch
- C. Investment planning
- D. Project definition
- E. Ordering
Answer: A,C,D
NEW QUESTION 58
What does the cycle set sequence in a multiple-counter maintenance plan determine?
Please choose the correct answer.
Response:
- A. The operation sequence of a task list
- B. The scheduling sequence for a group of maintenance plans
- C. The operation sequence of a maintenance order
- D. The scheduling sequence of a maintenance item
Answer: D
NEW QUESTION 59
You are installing a new SC9000. Which procedure should be used to install and configure the system?
- A. Connect through the Dell Storage Manager Client
- B. Connect through the supplied proprietary serial cable to the serial port
- C. Connect through a null modem cable to the serial port
- D. Connect through the iDRAC port
Answer: B
NEW QUESTION 60
Your customer wants to establish a maintenance work center with various activity types, each with a different fixed price.
How do you accomplish this?
- A. Create various maintenance activity types in each work center and assign a price.
- B. Define the activity types for each maintenance planning plant.
- C. Create various maintenance activity types with the fixed prices and assign them to the work center.
- D. Define the activity types in Controlling and assign them to the cost center of the work center.
Answer: D
NEW QUESTION 61
Your customer wants to create a component for maintenance that does not allow physical inventory.
Which material type must you use?
- A. Non-valuated materials (UNBW)
- B. Maintenance assembly (IBAU)
- C. Spare parts (ERSA)
- D. Operating supplies (HIBE)
Answer: B
NEW QUESTION 62
What information does the value category provide in the maintenance order?
- A. A summary of costs for multiple cost elements
- B. The material costs by valuation category
- C. The costs details for individual technical objects
- D. The costs by work center
Answer: A
NEW QUESTION 63
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?
- A. In the internal activity value category
- B. In a new, automatically created value category
- C. In the overhead value category
- D. In the unassigned value category
Answer: D
NEW QUESTION 64
Which of the following steps must you perform to customize priorities for a maintenance order?
Please choose the correct answer.
Response:
- A. Assign a priority type to a technical object master record.
- B. Assign a priority type to an order type.
- C. Assign priorities to order types.
- D. Assign priorities to technical object master records.
Answer: B
NEW QUESTION 65
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?
- A. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
- B. Dismantle the old measuring point and create a new measuring point.
- C. Create a special measuring document and set the Counter Replacement indicator.
- D. Create a new technical object to represent the new measuring point.
Answer: C
NEW QUESTION 66
Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisions and create maintenance orders automatically.
What must you do in Customizing?
- A. Create a revision type and select Not WPS-Controlled.
- B. Create a revision type and select WPS-Controlled.
- C. Define field values for PM/PS Reference Element
- D. Define transfer of project or investment program
Answer: B
NEW QUESTION 67
In order costing configuration, for what is the allocation structure used?
- A. To allocate costs to a hierarchy of maintenance technical objects
- B. To determine the cost elements that are allowed in the plant maintenance order
- C. To provide a method of consolidating costs in the Plant Maintenance Information System
- D. To determine the settlement receiving elements for costs debited to the order
Answer: D
NEW QUESTION 68
Which of the following components is included in SAP Solution Manager?
Please choose the correct answer.
Response:
- A. Master data management
- B. SAP NetWeaver Business Warehouse
- C. SAP NetWeaver Enterprise Search
- D. Service Desk
Answer: D
NEW QUESTION 69
Which steps must you perform to enable the valuation of characteristics for a piece of equipment?
(Choose three)
- A. Create characteristics in the classification system.
- B. Assign a class to the equipment category.
- C. Assign characteristics to a class.
- D. Assign a class to a piece of equipment.
- E. Assign characteristics to the equipment class type.
Answer: A,C,D
NEW QUESTION 70
How does SAP make new functions of the SAP ERP application available to customers?
- A. Via enhancement packages
- B. Via add-ons
- C. Via best practices
- D. Via Support Packages
Answer: A
NEW QUESTION 71
Your customer has several plants. How do you set up the maintenance organizational structure to implement centralized maintenance planning?
Please choose the correct answer.
Response:
- A. Assign all your work centers to one of your maintenance plants.
- B. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
- C. Define a plant and assign it to a company code.
- D. Assign all your work centers to one of your central planning plants.
Answer: B
NEW QUESTION 72
What is a method for loading data from source system datasets to a Data Source extraction structure?
Please choose the correct answer.
Response:
- A. Info source
- B. Extractor
- C. Info provider
- D. Transfer structure
Answer: B
NEW QUESTION 73
Your customer wants to assign maintenance orders to network activities automatically with the Maintenance Event Builder (MEB). Which of the following steps must you perform? (Choose two.)
- A. Assign the Reference PM/PS element to task list headers and network activities.
- B. Assign maintenance orders manually to a revision with revision type WPS-controlled.
- C. Set the Define Transfer of Project or Invest Program indicator.
- D. Assign a network to a revision with revision type WPS-controlled.
- E. Assign a hierarchical task list to a notification.
Answer: A,D
NEW QUESTION 74
......
SAP C_TPLM30_67 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Customizing Organizational Units 8% - 12% | Configure the Organizational Units required for processing Maintenance & Repair transactions. |
| Planning Preventative Maintenance Business Processes 8% - 12% | Describe the business processes associated with Preventive Maintenance and define roles and authorizations. |
| Customizing Analysis and Reporting < 8% | Configure and execute various reporting options for maintenance and preventative maintenance processing. |
| Managing Technical Objects < 8% | Maintain Equipment master data, BOMs, and Classification settings. |
| Customizing Refurbishment < 8% | Configure the required master data and related elements for refurbishment processing.
|
| Customizing Maintenance Processing > 12% | Configure the settings required for Maintenance processing, including scheduling and planning. |
| Customizing Preventive Maintenance > 12% | Configure the necessary maintenance plan elements used in Prevenative Maintenance. |
| Customizing Technical Objects > 12% | Configure the Technical Objects used in Maintenance & Repair transactions. |
| Executing Maintenance Business Processes > 12% | Describe how SAP ERP supports the business processes for Maintenance and Repair.
|
C_TPLM30_67 Dumps and Exam Test Engine: https://www.testkingfree.com/SAP/C_TPLM30_67-practice-exam-dumps.html