NEW QUESTION 50
Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the customer need to be aware of?
Please choose the correct answer.
Response:

  • A. Planned costs must not exceed the estimated costs.
  • B. A specific order type in which cost estimates are activated must be used.
  • C. Planned costs overwrite estimated costs after release of the order.
  • D. Upon release of the order, estimated costs cannot be revised.

Answer: D

 

NEW QUESTION 51
Your customer wants to assign maintenance orders to network activities automatically with the
Maintenance Event Builder (MEB).
Which of the following steps must you perform?
There are 2 correct answers to this question.
Response:

  • A. Assign the Reference PM/PS element to task list headers and network activities.
  • B. Set the define Transfer of Project or Invest Program indicator.
  • C. Assign maintenance orders manually to a revision with revision type WPS-controlled.
  • D. Assign a network to a revision with revision type WPS-controlled.
  • E. Assign a hierarchical task list to a notification.

Answer: A,D

 

NEW QUESTION 52
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?

  • A. In the internal activity value category
  • B. In a new, automatically created value category
  • C. In the overhead value category
  • D. In the unassigned value category

Answer: D

 

NEW QUESTION 53
Which utility is used to discover and configure an uninitialized SCv2000 array?

  • A. DSM Collector
  • B. DSM Client
  • C. PuTTy
  • D. Remote Client

Answer: B

 

NEW QUESTION 54
For which business requirements must you use serial numbers? (Choose two)

  • A. To have a future option to track material items as pieces of equipment
  • B. To uniquely identify inventory material items
  • C. To have the option to track batches
  • D. To have a future option to track material items as pieces of functional locations

Answer: A,B

 

NEW QUESTION 55
What are the prerequisites for installing equipment at a functional location? (Choose two)

  • A. The functional location master record allows the installation.
  • B. A fixed asset is assigned to the equipment.
  • C. The equipment category of the equipment allows the installation.
  • D. A cost center is assigned to the equipment.

Answer: A,C

 

NEW QUESTION 56
Which statements apply to a client in an SAP system?
Choose the correct answer(s).
Response:

  • A. A client corresponds to a customer.
  • B. In business terms, the client is a completely independent unit.
  • C. Each client has their own database.
  • D. A client can represent the mapping for an entire enterprise.

Answer: B,D

 

NEW QUESTION 57
Find out the elements responsible for performance management. (Choose three.)

  • A. Execution
  • B. Dispatch
  • C. Investment planning
  • D. Project definition
  • E. Ordering

Answer: A,C,D

 

NEW QUESTION 58
What does the cycle set sequence in a multiple-counter maintenance plan determine?
Please choose the correct answer.
Response:

  • A. The operation sequence of a task list
  • B. The scheduling sequence for a group of maintenance plans
  • C. The operation sequence of a maintenance order
  • D. The scheduling sequence of a maintenance item

Answer: D

 

NEW QUESTION 59
You are installing a new SC9000. Which procedure should be used to install and configure the system?

  • A. Connect through the Dell Storage Manager Client
  • B. Connect through the supplied proprietary serial cable to the serial port
  • C. Connect through a null modem cable to the serial port
  • D. Connect through the iDRAC port

Answer: B

 

NEW QUESTION 60
Your customer wants to establish a maintenance work center with various activity types, each with a different fixed price.
How do you accomplish this?

  • A. Create various maintenance activity types in each work center and assign a price.
  • B. Define the activity types for each maintenance planning plant.
  • C. Create various maintenance activity types with the fixed prices and assign them to the work center.
  • D. Define the activity types in Controlling and assign them to the cost center of the work center.

Answer: D

 

NEW QUESTION 61
Your customer wants to create a component for maintenance that does not allow physical inventory.
Which material type must you use?

  • A. Non-valuated materials (UNBW)
  • B. Maintenance assembly (IBAU)
  • C. Spare parts (ERSA)
  • D. Operating supplies (HIBE)

Answer: B

 

NEW QUESTION 62
What information does the value category provide in the maintenance order?

  • A. A summary of costs for multiple cost elements
  • B. The material costs by valuation category
  • C. The costs details for individual technical objects
  • D. The costs by work center

Answer: A

 

NEW QUESTION 63
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?

  • A. In the internal activity value category
  • B. In a new, automatically created value category
  • C. In the overhead value category
  • D. In the unassigned value category

Answer: D

 

NEW QUESTION 64
Which of the following steps must you perform to customize priorities for a maintenance order?
Please choose the correct answer.
Response:

  • A. Assign a priority type to a technical object master record.
  • B. Assign a priority type to an order type.
  • C. Assign priorities to order types.
  • D. Assign priorities to technical object master records.

Answer: B

 

NEW QUESTION 65
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

  • A. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
  • B. Dismantle the old measuring point and create a new measuring point.
  • C. Create a special measuring document and set the Counter Replacement indicator.
  • D. Create a new technical object to represent the new measuring point.

Answer: C

 

NEW QUESTION 66
Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisions and create maintenance orders automatically.
What must you do in Customizing?

  • A. Create a revision type and select Not WPS-Controlled.
  • B. Create a revision type and select WPS-Controlled.
  • C. Define field values for PM/PS Reference Element
  • D. Define transfer of project or investment program

Answer: B

 

NEW QUESTION 67
In order costing configuration, for what is the allocation structure used?

  • A. To allocate costs to a hierarchy of maintenance technical objects
  • B. To determine the cost elements that are allowed in the plant maintenance order
  • C. To provide a method of consolidating costs in the Plant Maintenance Information System
  • D. To determine the settlement receiving elements for costs debited to the order

Answer: D

 

NEW QUESTION 68
Which of the following components is included in SAP Solution Manager?
Please choose the correct answer.
Response:

  • A. Master data management
  • B. SAP NetWeaver Business Warehouse
  • C. SAP NetWeaver Enterprise Search
  • D. Service Desk

Answer: D

 

NEW QUESTION 69
Which steps must you perform to enable the valuation of characteristics for a piece of equipment?
(Choose three)

  • A. Create characteristics in the classification system.
  • B. Assign a class to the equipment category.
  • C. Assign characteristics to a class.
  • D. Assign a class to a piece of equipment.
  • E. Assign characteristics to the equipment class type.

Answer: A,C,D

 

NEW QUESTION 70
How does SAP make new functions of the SAP ERP application available to customers?

  • A. Via enhancement packages
  • B. Via add-ons
  • C. Via best practices
  • D. Via Support Packages

Answer: A

 

NEW QUESTION 71
Your customer has several plants. How do you set up the maintenance organizational structure to implement centralized maintenance planning?
Please choose the correct answer.
Response:

  • A. Assign all your work centers to one of your maintenance plants.
  • B. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
  • C. Define a plant and assign it to a company code.
  • D. Assign all your work centers to one of your central planning plants.

Answer: B

 

NEW QUESTION 72
What is a method for loading data from source system datasets to a Data Source extraction structure?
Please choose the correct answer.
Response:

  • A. Info source
  • B. Extractor
  • C. Info provider
  • D. Transfer structure

Answer: B

 

NEW QUESTION 73
Your customer wants to assign maintenance orders to network activities automatically with the Maintenance Event Builder (MEB). Which of the following steps must you perform? (Choose two.)

  • A. Assign the Reference PM/PS element to task list headers and network activities.
  • B. Assign maintenance orders manually to a revision with revision type WPS-controlled.
  • C. Set the Define Transfer of Project or Invest Program indicator.
  • D. Assign a network to a revision with revision type WPS-controlled.
  • E. Assign a hierarchical task list to a notification.

Answer: A,D

 

NEW QUESTION 74
......


SAP C_TPLM30_67 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Customizing Organizational Units 8% - 12%

Configure the Organizational Units required for processing Maintenance & Repair transactions.

Planning Preventative Maintenance Business Processes 8% - 12%

Describe the business processes associated with Preventive Maintenance and define roles and authorizations.

Customizing Analysis and Reporting < 8%

Configure and execute various reporting options for maintenance and preventative maintenance processing.

Managing Technical Objects < 8%

Maintain Equipment master data, BOMs, and Classification settings.

Customizing Refurbishment < 8%

Configure the required master data and related elements for refurbishment processing.

  • PLM300
Customizing Maintenance Processing > 12%

Configure the settings required for Maintenance processing, including scheduling and planning.

Customizing Preventive Maintenance > 12%

Configure the necessary maintenance plan elements used in Prevenative Maintenance.

Customizing Technical Objects > 12%

Configure the Technical Objects used in Maintenance & Repair transactions.

Executing Maintenance Business Processes > 12%

Describe how SAP ERP supports the business processes for Maintenance and Repair.

  • PLM300

 

C_TPLM30_67 Dumps and Exam Test Engine: https://www.testkingfree.com/SAP/C_TPLM30_67-practice-exam-dumps.html