
Exam Questions Answers Braindumps H20-923_V1.0 Exam Dumps PDF Questions
Download Free Huawei H20-923_V1.0 Real Exam Questions
NEW QUESTION # 36
Which of the following are the user roles of Power Partner?
- A. Service manager of a rep office
- B. Project manager
- C. DOC
- D. Service engineer
- E. Startup engineer
- F. Inventory operations manager
Answer: A,B,C,D,E,F
Explanation:
Power Partner is Huawei Digital Power's partner service platform used to support delivery, commissioning, maintenance, and service operations across the full lifecycle of a project. To match real project workflows, the platform defines multiple user roles that align with different responsibilities and permission scopes. AStartup engineerfocuses on commissioning activities such as obtaining startup authorization, performing initial configuration, and completing functional verification. AService engineerhandles routine maintenance, inspections, troubleshooting, part replacement guidance, and closure of service cases. AProject managercoordinates delivery milestones, resource planning, and overall service execution to ensure acceptance criteria are met. AnInventory operations managermanages materials/parts flow, tracking, and availability to support timely repair and maintenance. TheDOC (Delivery/Dispatch Operations Center)role supports centralized operations such as work order dispatching, progress supervision, and process compliance.
Aservice manager of a representative officetypically oversees regional service quality, governance, and authorization control, ensuring the right people have the right access and that services are delivered according to Huawei process requirements.
NEW QUESTION # 37
For hourly statistics reports, data of up to how many days can be queried? For monthly statistics reports, data of up to how many years can be queried?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
Explanation:
In Huawei NetEco statistical reporting, the query range is constrained by the report data retention policy and how summary data is stored. Forhourly statistics, the platform keeps a limited window of high-granularity data to balance storage consumption and performance. The hourly report retention is120 hours, which equals5 days. That is why hourly statistics queries are limited to5 days-beyond that window, hourly granularity is no longer retained in the report database for direct querying. For longer time horizons, NetEco relies on lower- granularity summaries (daily/weekly/monthly/yearly). Formonthly statistics, the platform supports long-term trend analysis and KPI tracking, and the maximum historical horizon aligns with the long-term statistics retention boundary used by NetEco reporting, which isup to 5 years. This design ensures fast query response, manageable database growth, and clear separation between short-term operational detail (hourly) and long- term management analysis (monthly/yearly).
NEW QUESTION # 38
After the battery module is installed, the torque and insulation should be checked according to the specified requirements.
- A. False
- B. True
Answer: B
Explanation:
This statement is true because post-installation verification is a mandatory acceptance step for battery systems in data centers. After a battery module is installed,torque verificationensures that all power terminals, interconnect bars, and grounding points meet the specified tightening requirements. If torque is too low, contact resistance increases, which can cause abnormal heating, voltage drop, nuisance alarms, and even connector damage during high current charge/discharge. If torque is too high, threads, lugs, or busbars can be damaged, creating hidden reliability risks.Insulation testingconfirms that the battery circuit has no unintended leakage paths to chassis or ground and that cable routing, connector seating, and protective covers are correct.
This is especially important for lithium battery cabinets where high DC voltage and large fault current capability demand strict electrical isolation. Performing torque and insulation checks after installation reduces early-life faults, improves safety, and ensures the cabinet can pass commissioning tests and enter stable service under UPS charge/discharge control.
NEW QUESTION # 39
Which of the following are the user roles of Power Partner?
- A. Service manager of a rep office
- B. Project manager
- C. DOC
- D. Service engineer
- E. Startup engineer
- F. Inventory operations manager
Answer: A,B,C,D,E,F
NEW QUESTION # 40
Video management can connect to the third-party video surveillance subsystem and play historical videos.
- A. False
- B. True
Answer: B
Explanation:
In Huawei's data center O&M architecture, video is treated as an important auxiliary capability for security and remote operation. TheVideo Managementfunction is designed not only to view live camera feeds, but also to integrate video resources into the same O&M workflow as alarms, access control events, and environmental monitoring. In typical deployments, the actual video storage and recording are handled by athird-party video surveillance subsystem(for example, an NVR/VMS platform). Huawei's video management function can connect to that third-party subsystem so that camera resources can be accessed in a unified interface, allowing operators to perform linkage operations such as "view video on alarm" and routine security inspection without switching platforms. Because historical recordings are stored by the surveillance subsystem, once the integration is established and permissions are correctly configured, operators can retrieve andplay back historical videofor event tracing, audit, and incident investigation. This supports closed-loop O&M: alarm/event occurs # video verification # root-cause confirmation # maintenance action # evidence retention.
NEW QUESTION # 41
Which of the following statements are true about the routine maintenance of a UPS?
- A. UPS status check: Check whether the UPS works in normal mode, whether an alarm is generated, and whether the UPS is in a proper load.
- B. Environment check: Check whether the temperature and humidity of the equipment room meet the recommended environment requirements. Check whether the equipment room is clean and tidy.
- C. Routine maintenance of vulnerable components: Periodically check the UPS fan operation, whether there is noise, and whether the rotation speed is abnormal.
- D. If there is no alarm on the UPS panel, do not need to check the installation environment, temperature, and humidity onsite.
Answer: A,B,C
Explanation:
Routine UPS maintenance is preventive by design, so it must cover bothenvironmental conditionsandequipment operating status, not only alarms. The equipment room environment directly affects UPS reliability: high temperature accelerates capacitor aging, reduces battery/rectifier reliability, and may trigger derating; improper humidity increases the risk of condensation or electrostatic discharge; dust and poor housekeeping raise the risk of blocked airflow and overheating. Therefore, theenvironment checkin option A is a standard routine item. Option B is also essential because O&M personnel must confirm the UPS is innormal operating mode, verify no hidden alarms exist in the event log, and ensure the load level is within the recommended range to maintain redundancy and efficiency. Option C is true because fans are typical
"wear-out" components; abnormal noise or speed changes often appear before a failure and can be detected early through inspection. Option D is false: absence of a front-panel alarm never replaces onsite environmental inspection and basic preventive checks.
NEW QUESTION # 42
During routine maintenance of the lithium battery cabinet, which of the following procedure is true about replacing a faulty battery module?
- A. 1-2-3-6-5-7-4
- B. 1-6-3-2-5-7-4
- C. 1-3-2-6-5-7-4
- D. 1-6-2-5-3-7-4
Answer: B
Explanation:
The correct sequence prioritizeselectrical safety first, then mechanical disassembly. You mustconfirm the batteries are not discharging(Step 1) to avoid working under load. Next, the cabinet must be placed into a safe powered-down state byswitching off the battery circuit breaker and long-pressing the POWER ON/OFF button to power off the cabinet(Step 6). Only after the cabinet is safely powered down should you open up the working area byremoving the front covers of the faulty module and adjacent modules(Step 3). Then youturn off the ready switchon the battery management module (Step 2) to prevent the system from re-enabling the module unexpectedly during maintenance. After that, youloosen the securing bolts and pull out the battery management module about 10 cm(Step 5) to create operating space and ensure isolation for subsequent operations. With the cabinet safely stopped, you canremove the cables and copper barsconnected to the faulty module (Step 7), and finallyremove the baffle plate and pull out the faulty battery module(Step 4).
NEW QUESTION # 43
Through device management, you can view the information about
- A. Signal
- B. Overview
- C. Service period
- D. Alarm
Answer: A,B,C,D
Explanation:
In Huawei smart module management (such as on the ECC800-Pro/WebUI),Device Managementis used to centrally view and maintain managed objects (UPS, SmartLi, rPDU, sensors, air conditioners, etc.).
TheOverviewpage provides a consolidated snapshot of a device's operating status, key parameters, running mode, and basic identification information so engineers can quickly judge whether the device is healthy and online. TheAlarmview lists active and historical alarms related to the device, supporting rapid fault isolation and verification after recovery. TheSignalview shows monitoring points and I/O status (including analog values and digital inputs/outputs where applicable), which helps engineers confirm sensor wiring, linkage logic, and real-time state changes during commissioning and troubleshooting. TheService periodinformation is used for lifecycle and maintenance planning, such as tracking service time, maintenance intervals, or component life indicators where supported, enabling preventive maintenance and reducing unexpected downtime. Therefore, Device Management supports viewing all four categories.
NEW QUESTION # 44
The default address of the WAN1 port on the ECC800-Pro is
- A. 192.168.0.10
- B. 192.168.248.1
- C. 192.168.248.10
- D. 192.168.8.10
Answer: D
Explanation:
In Huawei smart module commissioning, the ECC800-Pro controller provides a dedicated management access path through its WAN ports. For on-site startup commissioning, technicians typically connect a laptop directly toWAN1and place the laptop IP address in the same subnet as the controller so they can open the WebUI and complete initial settings (time, network, device discovery, alarm checks, linkage tests, and parameter commissioning). Thefactory default IP address for WAN1 is 192.168.8.10, which is used as the initial access point before the address is planned and changed to match the customer's management network. This default design supports quick "point-to-point" commissioning without depending on upstream switches, DHCP services, or enterprise IP planning at the very beginning of deployment. After login, Huawei commissioning practice is to harden access (password/authentication completion), then update network parameters and integrate the ECC800-Pro into the site monitoring network to enable continuous O&M, remote alarm reporting, and device management.
NEW QUESTION # 45
What are the colors of indicators on the LCD panel of the MDU?
- A. Green
- B. Yellow
- C. Orange
- D. Red
Answer: A,B,D
Explanation:
On Huawei UPS systems (such as the UPS5000 series), the MDU LCD panel includes status indicators designed to provide an immediate visual understanding of the UPS operating condition and alarm severity.
The indicator system usesthree standard colors:green,yellow, andred.Greenindicates the UPS is operating normally and the power supply path is healthy.Yellowis used to show abnormal conditions that require attention, such as warnings or non-critical alarms, where the UPS can typically continue supplying power but O&M personnel should inspect and handle the issue within the required timeframe.Redindicates serious or critical conditions, such as major faults or alarms that may threaten continuous power supply or require urgent action according to operating procedures. These three colors align with the common Huawei alarm severity presentation logic on the UPS display and help technicians quickly judge whether the situation is normal, warning-level, or critical-level without entering deeper menus.Orangeis not used as an MDU indicator color in this context.
NEW QUESTION # 46
During routine maintenance of the lithium battery cabinet, which of the following areas should be protected from electric shocks caused by exposed hands or metal objects?
- A. Short-circuit copper bar between battery modules
- B. Battery general positive terminal
- C. Battery positive terminal
- D. Battery general negative terminal
- E. Battery negative terminal
Answer: A,B,C,D,E
Explanation:
In a lithium battery cabinet, any exposed conductive part that is electrically connected to the DC power path can present shock and arc risk, especially when technicians are using tools in a narrow space. Thegeneral positive/negative terminalsare the cabinet-level high-energy connection points, and accidental contact or bridging with a metal object can cause severe DC arcing, burns, and equipment damage. Thebattery positive and negative terminalson individual modules are also hazardous because each module contributes to the total string voltage and fault current capability. In addition, theshort-circuit copper bar between battery modulesis a direct conductive link in the series/parallel connection; it can be energized and can create an instant short circuit if contacted by tools, jewelry, or loose hardware. Huawei maintenance safety practice therefore requires insulating covers, protective shields, and strict tool control to prevent exposed hands or metal objects from contactinganyof these areas. Protecting all listed points reduces electric shock risk, prevents arc flash/arc burn incidents, and avoids unintended cabinet trips or permanent damage to terminals and busbars.
NEW QUESTION # 47
In a data center power distribution architecture, what is the primary function of a Static Transfer Switch (STS) for critical single-cord loads?
- A. Convert AC power to DC power for IT equipment
- B. Provide fast switching between two independent AC power sources to maintain continuity
- C. Reduce harmonic distortion by filtering non-linear loads
- D. Increase the output frequency from 50 Hz to 60 Hz
Answer: B
Explanation:
Huawei data center power distribution design prioritizes continuity for critical loads. For single-cord IT equipment that cannot accept dual inputs, an STS provides a practical high-availability approach by connecting the load to two independent AC sources (often A and B feeds) and transferring the load to the healthier source when abnormalities occur. The key value is speed and coordination: the STS detects voltage/frequency deviations or source failure and performs a rapid transfer to minimize or eliminate interruption seen by the load. This supports O&M strategies where upstream systems (UPS, PDUs, distribution boards) are maintained or isolated without forcing downtime on single-cord devices.
In routine operations, STS status, transfer logs, alarms, and source quality parameters are monitored to prevent nuisance transfers and to ensure correct upstream selectivity and grounding. Correct commissioning also ensures the two sources meet synchronization conditions and that bypass
/maintenance procedures are standardized, improving safety and reducing operational risk.
NEW QUESTION # 48
Which of the following is the procedure for replacing a damaged UPS power module onsite?
- A. ##
- B. ##
- C. ##
- D. ##
Answer: D
Explanation:
For onsite replacement of a UPS power module, Huawei's maintenance logic follows a safe "isolate # remove
# insert # re-enable" sequence controlled by the moduleready switch. During removal, the ready switch must be rotated to theOFFstate first so the module is logically isolated from operation and will not participate in power conversion. After isolation, the four fixing screws are removed and a short waiting period is required to allow internal energy in capacitors to discharge before the module is pulled out. This matches statement#.
During installation, the ready switch must remainOFFbefore insertion to prevent unintended startup or arcing during connector engagement. The module is placed in position, inserted slowly and evenly until fully seated, then secured with the four screws. Only after mechanical fastening and full seating is confirmed should the ready switch be rotated to theONstate to allow the system to recognize and bring the module online. This matches statement#.
NEW QUESTION # 49
The NetEco service program backend can be accessed through the iBMC port.
- A. True
- B. False
Answer: B
Explanation:
In Huawei data center facility management,NetEcois the management software platform (server/application) used to centrally monitor and manage sites, whileiBMCis the out-of-band hardware management interface used forserver remote maintenance(such as power control, hardware health, BIOS settings, and remote console) on the specific server where iBMC exists. TheiBMC port is not a service access interface for NetEco. NetEco's backend services are accessed through theserver operating system network interfaces (management/service network) and corresponding application ports after the server is properly networked and configured. Even if NetEco is deployed on a Huawei server that has iBMC, iBMC only provides a channel to manage the server hardware and does not expose NetEco application access as an official commissioning
/O&M path. Therefore, NetEco backend access should be planned via the site's management network (IP addressing, routing, security policy), not via iBMC.
NEW QUESTION # 50
Which of the following control modes can be used for temperature and humidity control of smart cooling products?
- A. Hot aisle
- B. Cold aisle
- C. Return air
- D. Supply air
Answer: B,C,D
Explanation:
Smart cooling temperature and humidity control is based on where the control "reference point" is measured and regulated.Supply air controluses the unit outlet sensor as the main reference, so the system directly regulates the temperature (and humidity when configured) of the air delivered to the IT area. This provides stable supply conditions and is widely used for predictable airflow organization.Return air controluses the unit inlet/return sensor as the reference, reflecting the heat absorbed from IT loads; it helps the unit respond to real load changes and maintain stable operation when room mixing or load distribution varies.Cold aisle controluses sensors placed in the cold aisle (near rack inlets) as the reference, aligning control with the most critical point for IT reliability-server intake conditions-especially in contained aisle scenarios.Hot aisleis generally not used as a primary temperature-and-humidity control mode because hot aisle conditions are intentionally high and variable (driven by load and containment), and controlling to hot aisle targets can conflict with ensuring stable rack inlet temperature and proper dehumidification behavior. Therefore, A, B, and C are valid control modes.
NEW QUESTION # 51
Which of the following models is a Huawei in-room chilled water horizontal air supply product?
- A. FusionCol8000-C210H
- B. FusionCol5000-A050H
- C. NetCol8000-C070D
- D. NetCol5000-A070U
Answer: B
Explanation:
Huawei room-level air conditioning products are commonly identified by the series name plus a model suffix that indicates the cooling medium and airflow form factor. Anin-room chilled waterunit uses a chilled-water coil as the primary heat-exchange component and relies on the building's chilled-water system (chiller/plant) rather than an onboard refrigeration compressor for cooling generation. "Horizontal air supply" describes the discharge direction: the unit supplies conditioned air laterally into the room or into a specific airflow organization (such as cold-aisle delivery), supporting predictable airflow paths and stable return air conditions. Within the provided options,FusionCol5000-A050His the model that matches both identifiers: it belongs to Huawei's room cooling product line and the model code indicates an in-room configuration withchilled-watercapability andhorizontalair supply orientation. The other options belong to different series or represent configurations typically associated with other deployment forms (such as different placement, airflow direction, or system architecture). Therefore, the correct selection isFusionCol5000-A050H.
NEW QUESTION # 52
In a data center fire protection design, which approach best matches Huawei facility practice for protecting IT rooms while minimizing secondary damage to IT equipment?
- A. Use only portable extinguishers and rely on manual response
- B. Disable automatic suppression to avoid accidental discharge
- C. Install a water sprinkler system as the only suppression method inside the IT white space
- D. Deploy a smoke detection system plus a clean-agent gas extinguishing system with interlock controls for automatic release
Answer: D
Explanation:
Huawei data center facility design typically follows a layered fire protection concept: early detection, controlled alarm linkage, and suppression methods that protect equipment and ensure personnel safety.
A smoke detection system (often combined with staged alarms) provides early warning so operators can verify events and initiate emergency procedures. For the IT white space, a clean-agent gas extinguishing system is preferred because it suppresses fire without leaving residue and significantly reduces the risk of corrosion or contamination compared with powder-based agents. The extinguishing system is normally integrated with linkage/interlock controls: audible/visual pre-discharge alarms, time delay, emergency abort, door access control logic, and HVAC shutdown or damper control to help maintain agent concentration. This coordinated mechanism reduces false discharge risk while preserving a reliable automatic response if a real fire develops. In contrast, relying only on manual extinguishers is too slow for rapid fire growth, and water sprinklers alone can cause substantial collateral damage to servers and power equipment.
NEW QUESTION # 53
Huawei-developed intelligent rPDU (PDU2000M) can replace the original UIM20A expansion module. The rPDU can connect to the cabinet temperature/humidity sensors, smart U space managers, and door status sensors.
- A. False
- B. True
Answer: B
Explanation:
In Huawei smart module monitoring architecture, theUIM20A expansion moduleis traditionally used toincrease device portsso cabinets can connect multiple intelligent components and sensors (for example, door status and environmental sensors). Huawei also provides theintelligent rPDU PDU2000M, whosemain control moduleincludes communications and DI interfaces designed to directly##cabinet-level intelligent devices for centralized monitoring and management. In Huawei's solution description for rPDU-monitoring networking, thePDU2000M is positioned to replace the expansion-module role, meaning that in applicable scenarios, cabinets can connect monitoring devices through the PDU2000M without deploying an additional UIM20A expansion module. This supports practical connections such asT/H sensors,smart U space managers, anddoor status/door-access related signalsthrough the PDU2000M interfaces, and then these devices are managed
/bound in the controller's smart module view. Huawei O&M guidance also emphasizes avoiding duplicate connections (do not connect the same device to both UIM20A and PDU2000M), aligning with the replacement concept. (Scribd)
NEW QUESTION # 54
On the ECC800-Pro WebUI, the PUE configuration mode can be "Standard" or "User-defined".
- A. False
- B. True
Answer: B
Explanation:
Huawei's ECC800-Pro supports PUE (Power Usage Effectiveness) management as part of its energy efficiency and green data center features. In practical O&M, different sites calculate PUE differently depending on metering topology, what loads are included (IT load only vs. auxiliary loads), and whether the site uses integrated modules (UPS, cooling, lighting, etc.) or external systems. To handle these real-world differences, the ECC800-Pro provides two PUE configuration approaches on the WebUI."Standard"mode is used when the site's metering points and calculation logic align with a predefined Huawei template, enabling rapid commissioning and consistent reporting."User-defined"mode is used when the customer's metering structure or management requirements differ-allowing engineers to select specific measurement points, define inclusion/exclusion rules, and tailor the calculation path so that displayed PUE matches the site's accepted KPI definition. This dual-mode design ensures PUE is both standardized where possible and flexible where necessary, improving energy analysis accuracy and supporting optimization actions.
NEW QUESTION # 55
......
Latest Huawei H20-923_V1.0 Real Exam Dumps PDF: https://www.testkingfree.com/Huawei/H20-923_V1.0-practice-exam-dumps.html
H20-923_V1.0 Exam Dumps, H20-923_V1.0 Practice Test Questions: https://drive.google.com/open?id=18MJEygoP22AzSoB43MsBa_BacZuZv9vY